Electrical Installation Featured

Port Terminal Lighting & Electrical Installation

Installation of high-power LED lighting and stainless steel cable trays in a Natural Gas receiving terminal.

Client Port Terminal (AES Andrés) Category Electrical Installation Date February 15, 2024
Port Terminal Lighting & Electrical Installation

The Challenge

The Natural Gas receiving terminal (a critical security zone) required a substantial improvement in the lighting of its access catwalks and Mooring Dolphins.

The extreme saline environment demanded corrosion-resistant materials. Additionally, the existing circuit was insufficient for safe night operations and required a load capacity upgrade.

The VPM Solution

We executed a comprehensive lighting repowering and electromechanical assembly project under strict port safety standards.

1. Stainless Steel Infrastructure

To guarantee durability in the marine environment:

  • Installation of stainless steel cable trays (3”x3” and 4”x4”) on the Dolphins for power and control wiring protection.
  • Mounting of APPLETON T-type and L-type junction boxes (weatherproof certified).
  • Fixture mounting on structural beams using hot-dip galvanized supports.

2. Circuit Repowering

The increased lighting load required electrical circuit re-engineering:

  • Load Calculation: Total load increased from 148 Watts to 2,098 Watts on the RL8 circuit.
  • Protection: Substitution of the original 10 Amp control breaker with a new 20 Amp one to support the new demand without tripping.
  • Technology: Installation of 12 Type F (AR30) luminaires (325 Watts), improving visibility by 400%.

3. Results & Safety

  • Operational Visibility: Optimal lighting on Mooring Dolphins for night docking maneuvers.
  • Durability: Conduit system 100% resistant to marine corrosion.
  • Compliance: Project delivered complying with industrial safety standards for fuel terminals.

VPM Electromechanical offers robust solutions for Free Zones, Ports, and aggressive industrial environments.